top of page

GOLD LONG JOHN 3

CAPACITY

WHERE

WHEN

193 KW

DONG NAI

JUN 2023

Indefol Solar and Gold Long John, under the Long John Group umbrella, solidified an agreement in June 2023 for a solar project generating 193 kW. This installation is equipped with state-of-the-art electronic devices and switches provided by ABB (Italy), facilitating synchronization with the existing Gold Long John 1 facility. Structural integrity is paramount, with Schettler brackets (Germany) incorporated into the solar frame, guaranteeing dependable performance and resistance to wind and storm damage for a minimum of 25 years.

bottom of page